Karakalpak State University named after Berdakh
Hydraulic and geotechnical engineering
About the programme
Bachelor's degree training in the field of education 60731200-hydraulic engineering and geotechnical engineering is carried out in full-time, evening and correspondence forms of education. Education in all forms of education is organized according to a credit-modular system. The standard duration of the full-time bachelor's degree program is 4 years.
Professional competencies:
- Has the skills to search, analyze regulatory legal acts and their use in the professional activities
of the organization and management of processes in the field of hydraulic engineering;
- work at construction sites as a foreman (foreman), foreman (foreman), perform technological tasks of construction production;
-compilation and application of calculation and technological maps of individual technological processes of various construction facilities:
- quality control of materials and structures used in construction;
- monitoring compliance with the technology of construction of hydraulic structures;
- preparation of technical documentation (work schedules, instructions, plans, estimates, orders for materials and equipment) during the construction of hydraulic structures;
- preparation for the construction of territories where construction, repair and reconstruction work will be carried out;
- design, construction, reconstruction and repair work at construction sites;
Similar programmes
ALMALYK STATE TECHNICAL INSTITUTE
Mining (open pit mining)
9 500 000 so'm
per year · ≈ $807
ALMALYK STATE TECHNICAL INSTITUTE
Mechanical Engineering
9 500 000 so'm
per year · ≈ $807
Kimyo International University in Tashkent
Mechanical Engineering
24 000 040 so'm
per year · ≈ $2,039
Tashkent Institute of Chemical Technology
Technology for the cultivation and processing of medicinal plants
10 049 550 so'm
per year · ≈ $854
Samarqand xalqaro texnologiya universiteti
Mechanical Engineering
40 000 000 so'm
per year · ≈ $3,398
Kimyo International University in Tashkent
Alternative energy sources
24 000 040 so'm
per year · ≈ $2,039